• Soft ground Treatment
  • 홈
  • Home > BUSINESS > Soft ground Treatment
  • M.M-P.V.D 공법
  • There is a trustworthy company, a company that strives, and a construction centered on it.
  • 3 mandrels can be driven simultaneously
  • ① Shortening of construction period
    ② High working efficiency
    ③ Saving cost

  • Multi mandrel is detachable
  • Can expect improvement of working quality and saving cost by detach and selection of mandrel (casing)

  • Gap between mandrel can be adjusted
  • ① Gap between mandrel can be adjusted when necessary by operator
    ② Adjustable gap

  • Advantaged machine structure to meet each ground condition
  • Increased track width and space will improve stability and prevent overturning of machine.

  min max
3 mandrels 0.8m 1.2m
2 mandrels 1.6m 2.4m
1 mandrel  
.